Q: Do you accept custom designs from client drawings?
A: Yes,we build to your specifications with compliance optimization for ASME/PED/GB standards
Q: What parameters are required for quoting?
A: Mandatory:Design pressure/temperature,media properties,materials grade, dimensions:Optional:Welding procedure(WPS/PQR),NDT level (e.g.RT100%)
Q: What certifications come with export shipments?
A:Standard: Material Test Certs (EN 10204 3.1), Hydro Test Report, Nameplate:International: ASME U Stamp Data Pack, PED Declaration of Conformity
Q: What is the typical lead time?
A: For ASME pressure vessels,our typical lead time is :Off-Peak Period:30-90 days | High-Demand Period:90-180 days
This covers:Engineering review (5-7) days,Material procurement (15-30) days,ASME compliant febrication (variable),NDE&hydro testing (7-10) days
Q: How do you ensure product safety?
A:Material Traceability: Full EN 10204 3.1 certification:Heat number tracking | Mill test reports with PMI verification
Design: ASME U-stamp welding line | CNC forming station | Automated assembly/Painting line
Manufacturing: 100% full inspection protocol: Visual examination (VT per ASME SEC.V) | Functional pressure testing (Hydro/Pneumatic)
Pre-shipment: Hydrostatic Test at 1.5x design pressure